Skip to content
Project Radar

Building permit fee estimates for 36 US jurisdictions, worked out line by line from each county's or city's official fee schedule.

Project links

Visit productRequest correction

Project Note

A closer look at PermitPrice

Permit fee calculator that turns official fee schedules into line-by-line estimates.

What the permit will actually cost

You're pricing a new deck and the contractor's quote is clear enough, but the permit line is a guess. Generic guides say a few hundred dollars. PermitPrice was built to replace that guess with the number your county or city would actually charge.

It's the work of Munib Ur Rehman, who also runs the National Tax Tools calculators, and it sits in a small network of sites published under LMN Tax Inc. The about page describes the method plainly: read the official fee schedule PDFs and translate them into formulas, surcharge breakdowns, worked examples and calculators, with every dollar amount traced to a government source.

Same deck, very different fees

The home page makes its case with one example. A $15,000 deck in Fairfax County, Virginia comes to $504: a $450 base permit, a $9 state levy and a $45 technology surcharge, under the fiscal 2027 schedule that took effect July 1, 2026. The same deck in Chesterfield County costs $166.28, mostly a flat deck fee. That gap is exactly what a generic "$300 to $500" guide hides.

Pick your jurisdiction and project type, enter the estimated cost, and the calculator shows each charge on its own line. The full calculator covers 36 jurisdictions: eight in Virginia, Washington DC, eight Maryland counties and 19 Texas cities. Square-foot projects such as new homes and additions are priced in the full calculator and on each jurisdiction's page, and comparison pages line up the same project across neighbouring areas.

Before you budget with it

It's free, with no account, contact form or newsletter. According to its privacy policy, the site uses Google Analytics and Mediavine's Journey tool, which shows content recommendations and third-party ads, and both set cookies. Its scope is deliberately narrow: building permit fees only, with trade permits, zoning, inspections and impact fees left out. The home page lists its last launch review as May 9, 2026, so it's worth opening the linked fee schedule if your project is close to a deadline or a fee change.

The about page also discloses that the founder holds a Virginia real estate salesperson license through a referral brokerage, and says the site is independent of it.

If you're planning residential work in one of the 36 covered places, this gives you a sourced, line-by-line permit number instead of a rule of thumb. If your town isn't on the list, or you need trade or impact fees too, you'll still be calling the building department.

The PermitPrice homepage
The permitprice.com homepage as it looked on November 17, 2026.

Project note details

Dates and editorial links

Published

November 17, 2026

Updated

November 17, 2026

Last checked

Nov 17, 2026

Last checked is the most recent date PermitPrice's own public pages were visited for this note. Seen something that has changed since? Tell us and we'll fix it.

Note history

Publication and substantive update dates for this public note.

Nov 17, 2026
Project note published.

Want to come back to PermitPrice?

Save it to this browser. Your Saved list marks projects whose note or updates changed since you last looked.

Keep exploring

More like PermitPrice

For the makerAdd the badge to your site

If you made PermitPrice, you can post about this note with a ready-to-edit announcement, or show it on your own site with an optional badge that links back here. Neither changes the note's text or placement. This note's link to the project is marked as user-submitted until the project's site links back, for example with the badge, and is a full backlink while it does.

Want to keep this note's facts current yourself? Project Radar Pro lets a verified maker confirm status, pricing and platforms in a labeled block, post one update a month and see the note's activity totals. It never changes the note's text or placement. See what Pro includes

Building something useful?

Submit your project for free. If selected, it gets a Project Note that explains what it does and links to your work. Publication isn't guaranteed.

Submit a project